0102030405
Safety Electric Aluminum Extrusion Alloy Remote Control Storm Proof Interior Rolling Roller Shutters Profile
Product Introduction
1. Core Storm-Resistant Technologies
Structural Reinforcement Design:
Double-Layer Aluminum-Magnesium Alloy Slats (1.2mm thickness) with internal X-shaped reinforcement ribs, achieving an impact resistance of 50J (ASTM D5420 standard).
Embedded Rail Pressure Dispersion System transfers 70% of wind load to the building’s main structure.

2. Intelligent Safety Protection
Disaster Response System:
Built-in barometric pressure sensor (accuracy ±0.5hPa) to monitor storm-related pressure changes in real time.
Linked with meteorological data APIs to automatically lower shutters 30 minutes in advance (response time ≤8 seconds).
Dual-Mode Control System:
Mobile APP remote control (supports group management of multiple shutters).
Local voice control (compatible with Alexa/Google Home).
3. Industrial-Grade Reliability
Motor System:
German imported tubular motor (torque 120Nm, noise ≤35dB).
Dual power redundancy: mains power + lithium iron phosphate battery (72-hour backup).
Durability Verification:
Passed 300,000 opening/closing cycle tests (EN 60335-2-103 standard).
Tested in extreme temperatures of -40℃~80℃ (UL 94V-0 fire certification).

4.Technical Parameters
Project | Parameter |
Wind Pressure Resistance | EN 13561 Class 5 (1500Pa) |
Operation Speed | 0.25m/s (standard mode) |
Protection Class | IP65 (motor) / IP54 (control system) |
Product Details
Place of Origin | Guangdong, China |
Delivery Time | 15-20 days |
Temper | T3-T8 |
Application | Industrial or construction |
Shape | Customized |
Alloy or not | Is Alloy |
Material | 6063 / 6061 |
Brand Name | Yaoxing , Dazhen |
Processing Service | Cutting, drilling, machining, punching, bending, tapping, etc |
Surface treatment | Anodized, Powder coating, Polish, Electrophresis, Brush, Mill finish, wooden grain, or customized |
Color | Customized different colors for clients to choose |
Service | OEM & ODM |
Certification | CE, ROHS, ISO9001 |
Type | 100% QC Testing |
Size / Thickness | General profile thickness from 0.3 mm to 5.0 mm, length from 3 meter to 6 meter or customized length. Anodized protection film thickness from 8~25 um, powder coating from 40~120 um. |
Business type | Factory, Manufacturer |
Application
Coastal High-Rise Apartments
Dubai Marina Apartment Complex: Withstood a 2022 sandstorm (wind speed 25m/s).
Data Center Protection
Tencent Tianjin Data Center: Integrated with temperature/humidity monitoring to prevent rainwater backflow.
Hospital Clean Rooms
Peking Union Medical College Hospital Operating Rooms: Daily automatic disinfection mode (IP65 waterproof motor).
Surface Treatment
We have advanced fully automated production lines, powder coating lines, wooden grain lines, and anodized production lines. You can always find the suitable surface treatment you want. Besides, our production process conforms to the ISO9001 standard and get the Qualicoat already. Surface treatment produce from domestic top suppliers.

Electrophoresis

Mill finish

Blasting

Wood Grain

Powder Coating

Anodizing
Optional Packing solution

kraft paper packing

PE film+ shrink film packaging

protective film for each piece

protective polybag for each piece

wooden cartons

woven bag packing
FAQs
Q1: What’s your MOQ? And what is your delivery time?
A1: 500 KG for each model. Delivery time is about 15~ 20 days after confirmation.
Q2: If I need ODM service, what can I do?
A2: We provide ODM service. You can send us samples that you have, or you can provide CAD drawing to us. And our designer will design and make official CAD drawing, after client’s confirmation, we will make new molds and test samples. After confirmation of samples, we will start official production.
Q3: If I need samples, could you support?
A3: We can provide you free samples for checking quality, size, and surface treatment. Delivery fee should be paid by our customers.
Q4: How much does it cost and time to open a new mold?
The amount of mold cost if determined by the size of the mold. The mold size is larger, the cost is more. It takes about 7~10 days to open new mold.
Q5: What is your payment term?
A5: T/T 30% of total value as deposit, 70% balance should be paid before shipment. L/C or other payment term can be negotiated.
Q6: How many CBMs does a 20ft or 40ft cabinet have, and how many aluminum can it hold?
A6: 20ft can hold 34 CBM, 40ft can hold 68 CBM. The calculation method is cross-section area after each aluminum product is packaged * length = CBM.
description2